Construction Glossary

Decode construction terminology with ease. Your complete guide to understanding structural specifications, engineering terms, and municipal standards used by contractors in Bangalore.

🔍
Structural

RCC

Reinforced Cement Concrete

Concrete embedded with steel rebar to resist tensile forces. Form structural columns, beams, footings, and slabs.

Materials

TMT Steel

Thermo-Mechanically Treated Bars

High-ductility steel bars used in RCC. Fe-500D and Fe-550D denoting improved earthquake resistance and elongation.

Planning

BUA

Built-Up Area

The total floor area including carpet area, wall thickness, and balcony area. Construction pricing is quoted per sq.ft of BUA.

Civil

Plinth Level

Raised Ground Floor Level

The height at which the ground floor is raised from road level (typically 450-600mm) to prevent rainwater flooding into the house.

Geotechnical

SBC

Soil Bearing Capacity

Maximum load per unit area soil can support without settlement. Determines whether isolated, raft, or pile foundation is required.

Estimation

BOQ

Bill of Quantities

Detailed itemized list of materials, labor, and unit costs prepared by quantity surveyors for fixed-price contracts.

Services

MEP

Mechanical, Electrical & Plumbing

The three major building service networks integrated inside walls and ceilings. Accounts for ~20-25% of overall construction cost.

Civil

PCC

Plain Cement Concrete

Concrete mix without steel reinforcement, laid as a hard leveling base before installing RCC footings or ground floor slabs.

Waterproofing

DPC

Damp Proof Course

A continuous horizontal barrier laid at plinth height to prevent ground moisture from rising up wall masonry via capillary action.

Approvals

FAR / FSI

Floor Area Ratio / Space Index

Ratio of maximum allowable built-up area to plot area specified by BBMP / BDA. Determines total constructible square footage.

Materials

OPC / PPC

Ordinary / Pozzolana Cement

OPC 53 grade cement is used for RCC columns and slabs. PPC cement is used for plastering and masonry work for crack prevention.

Quality

Curing

Concrete Hydration Process

Maintaining water ponding or wet hessian cloth over fresh concrete for 28 days to achieve full characteristic design strength.